Politics

KCR’s Palatial Camp Office to Be a Role Model

GHMC a few days ago made Rain Water Harvesting Pits mandatory for all the new constructions in Hyderabad. But then this is not followed during the construction of the chief minister’s camp office-cum-residence in Begumpet.

[m9ad]

ADVERTISEMENT

But then after the construction is completed, the Chief Minister is now all set to have the RWH pits.The government had sanctioned 8 Lakhs for the construction of 20 rain water harvesting (RWH) pits within the premises. A team of experts earmarked the location of the pits in the premises.

Out of 20, only 14 structures are recharge pits while the remaining six are recharge pits along with injection wells. It is not clear who will foot the bill. It is either the irrigation department or the water board itself.

Share
Sridhar Raavi

Sridhar is a highly experienced hand in Telugu politics, writing and analyzing political happenings in Andhra Pradesh and Telangana. An IT engineer turned news junkie, Sridhar has a sharp eye for catching news as it u…

Published by

Recent Posts

Naga Chaitanya’s NC25: Rumours vs The Real Story

Naga Chaitanya’s landmark 25th film is already generating plenty of buzz, but the latest reports…

11 minutes ago

A Tough Phase, One Strong Bond: NTR on Karthikeya

NTR’s speech at the Don’t Trouble The Trouble pre-release event turned personal when he opened…

40 minutes ago