
[m9ad]
The seed access road is going to be an eight-lane road as suggested by experts with the minimal curves added keeping the future traffic in mind. After completing secretariat campus, this is the prestigious and big scale project going on in Amaravati.
The access road which is going to stretch for about 23 KM is being built in two phases, first with 18.27 KM long and 60 meters width connecting Undavalli and Dondapadu. The second phase is the 3.2 KM road which is built over the Krishna delta.
These 8-lanes comprise three rows of the carriageway and two rows of Bus rapid transit with space for greenery and a non-motor transport zone which is for cycling tracks and footpaths.
The fourth week in the Bigg Boss TV show began with a storm. Instead of…
Director Sukumar's assistants turned directors are trying to make a mark for themselves in Tollywood.…