
[m9ad]
AP’s share in thermal power plants located in Telangana is 44% and Telangana share in thermal power stations located in AP is 54%. The cost of power generation is higher for thermal power plants located in AP because of higher coal transportation costs, while thermal power plants in TS are located closer to the source of coal, thus is cheaper.
This is resulting in a burden of 1000 Crore per year on Telangana. Now, Telangana wants the power plants be shared on location basis so that it can utilize entire power generated in the thermal plants located in Telangana. But then, Telangana can not unilaterally cancel the PPAs without Center’s Intervention.
The couch is being set for one last time. Karan Johar's most talked-about, most controversial…
Andhra Pradesh historical produced some of the greatest chief minister in the country who had…