Data theft problems for Telangana Survey!

As the Telangana Survey date is drawing closer, the doubts surrounding the project are only increasing. The survey will be completed by 8 PM on 19th August and from then the onus is on the officials to data entry them. The collected date will be compiled at the mandal level and then transmitted to a server. However, there are no instructions if the server would be centralized or there will be multiple local servers.

ADVERTISEMENT

In Hyderabad, GHMC will take up the task of compiling data. The corporation will need close to 2,000 computers for the survey and is now in the process of identifying engineering colleges which have computers to seek their help. The collected data has sensitive information like bank accounts and liable to be misused in case the data entry centers are not properly monitored.

Share
Sridhar Raavi

Sridhar is a highly experienced hand in Telugu politics, writing and analyzing political happenings in Andhra Pradesh and Telangana. An IT engineer turned news junkie, Sridhar has a sharp eye for catching news as it u…

Published by
Tags: most viewed

Recent Posts

LPU Protest Turns Violent After Viral Rape Claims

LPU Protest Turns Violent After Viral Rape-Suicide Claims Tension broke out at Lovely Professional University…

50 minutes ago

ఖైరతాబాద్‌లో కవిత ఎవరిని గెలిపిస్తారు? ఓడిస్తారు?

దానం నాగేందర్‌ ఎమ్మెల్యే సీటు ఖాళీ అవడంతో ఆరు నెలల్లోగా ఖైరతాబాద్ ఉప ఎన్నిక జరుగుతుంది. ఇక నుంచి ప్రతీ…

54 minutes ago