Politics

Hyderabad Stamp for Bullet Train Logo

India’s first high-speed rail network project, namely the bullet train connecting Mumbai and Ahmedabad will have the logo designed by Chakradhar Aalla, a 27-year-old city youth from Lakdi-ka-pul. He bagged the first prize in the logo designing contest held by the National High-Speed Rail Corporation Limited (NHSRCL).

[m9ad]

ADVERTISEMENT

He also won one Lakh Prize Money. The logo will be the official logo of the Prestigious Project. The construction of the corridor began on 14 September 2017 as per schedule and the first bullet train is scheduled to leave for its first run on 15 August 2022.

Japan is funding the project and is also lending the necessary expertise for the construction as well. The project is estimated to cost ₹1.1 lakh crore (US$17 billion). JICA is funding 81% of the total project cost ₹88,087 crore through a 50-year loan at an interest rate of 0.1% with a moratorium on repayments up to 15 years

Share
Sridhar Raavi

Sridhar is a highly experienced hand in Telugu politics, writing and analyzing political happenings in Andhra Pradesh and Telangana. An IT engineer turned news junkie, Sridhar has a sharp eye for catching news as it u…

Published by

Recent Posts

2029 ఎన్నికలకు పాదయాత్రలే కేంద్ర బింధువులా.?

ఇప్పటికి రెండున్నరేళ్లు ముగిసిపోయాయి, మరో రెండున్నరేళ్లు కళ్ళు మూసుకుంటే నా పాదయాత్రతో యిట్టె మనం అధికారంలోకి వచ్చేస్తాం అంటూ వైఎస్…

18 minutes ago

Popular Actress Death Mystery: Big Court Relief for Ex-BF

Nearly 10 years after Pratyusha Banerjee died by suicide, the Bombay High Court has discharged…

23 minutes ago