Escalated cost Pouring water on Vizagites dreams!

The experts in geotechnical engineering and soil mechanics are delivering a bad news for Vishakapatnam people who are eagerly waiting for the promised Metro Rail Project to the city. Recently the soil along the three proposed Metro corridors is being tested and it is revealed that the soil there possesses multiple layers which may lead to a higher cost of the construction of pillars.

Metro Rail Project pillars need hard soil so as to make them durable but the Port City does not have a full portion of hard or disintegrated soil. According to estimates, the 39-km long VMR may have around 1,250 to 1,300 pillars.

ADVERTISEMENT

The cost of construction of a pillar ranges from Rs 1-1.5 crore but in the case of the Vizag metro it may go up by 15-20% due to the soil structure. Expert team from a Jaipur-based geotechnical engineering consultancy is expected to take up the soil test from March 20. The company is currently testing the soil for Vijayawada Metro.

Share
Ravi Kakarala

Ravi is the head of the Telugu section at M9 News, specializing in providing updates and content in native Telugu language. With extensive experience in Telugu media, Ravi has a strong command of the language and deli…

Published by

Recent Posts

Nandamuri Blessing For Koratala, Can’t Miss!

Despite delivering a decent hit in the form of Devara, Koratala Siva is without another…

9 minutes ago

తిమ్మరాజుపల్లి టీవీ: చివరికి మిగిలిందేమిటి?

హీరోగా తానే ఇప్పుడిప్పుడు నిలదొక్కుకుంటున్న తరుణంలో.. కిరణ్ అబ్బవరం కొత్తవాళ్లని ఎంకరేజ్ చేయడం కోసం దాదాపుగా 40 మంది నటీనటుల్ని…

18 minutes ago